Installing Multi Shelter Solutions Buildings

One of the most common questions we get asked is regarding installation of our structures. We have tried to create a simple yet effective solution for your applications, and recently have revamped our installation guide with more pictures, a glossary and more detailed instructions about everything to empower our customer more.

These structures are supplied as kits, intended for our customer to be able to install themselves. We are available for whatever questions you may have. We have confidence that you will be able to install these structures yourselves with a small team of people. You will get a complete manual with every order. You can download our instruction manual through the links below for a preview or to prepare for your delivery.

There is quite a bit of information contained in this manual that it CRITICAL to be understood. These structures are more complex to assemble than your typical Swedish Furniture.

The pages are in the order they should be read.
#1-2 are very important notes about installation and the rest of the manual.
1. START HERE
2. Warranty, Codes & Site Requirements
3. Anchoring-Base Brackets
3. Anchoring-Anchor Posts
4. ridge & hoops
5. Purlins & Windbraces
6. -optional- Cross Ties
7. Covering-Plastic Roof
7. Covering-Tarp Roof
8. -optional- Roll up Side Walls
9. Wirelock & Side Wall Cover Fasteners
10. -optional- Inflator Fan
11. Ends
12. -optional- Door Options

click here to download a step by step breakdown of the process in PDF format and click here to see a photo explanation of the process. You can also view the additional articles, links or videos on our how to page. Please note, not all pages or options apply to everyone. TO BE USED IN CONJUNCTION WITH THE MANUAL ABOVE, NOT AS A STAND ALONE RESOURCE.

Please see our more detailed installation page for more information

Covering Ends – Plastic & Tarp

Please refer to the Ends page in the assembly guide as well

When you are covering the ends of the structure, there are some similarities and some fundamental differences when you are covering with plastic or with tarp.

The aluminum wirelock channel must be installed on the top side of the hoop before you start the cover. The framing must also be in place before you are putting on the cover.

Your cover will be a rectangle and you must double check if the two ends were supplied as one piece or not.

  • You start at the base of one side and go continuously over the peak so that there is not an edge at the peak.
  • The cover gets fastened, temporarily, at the base first on either side of the door and then pull out to the corners.

If there is ANY wind, do into the wind side first.

  • Please remember that whenever you have wrinkles or folds, you will pull 90 degrees to the wrinkle.

Excess on the end covers will only get trimmed off after the roof cover is on as well.

If you are covering the end with plastic

  • you would go with the extra of your rectangle and fasten it temporarily to the back side of your framing.
  • At the very most, at this stage you will put part of a wire insert on either side of the peak.
  • When the cover is sitting smooth, you can put some strapping on the vertical framing to hole the cover in place.

If you are covering the ends with tarp

  • you will need to remove the wirelock channel first.

This may seem like double work, but the channel is now curved to the building with the required screw holes.

  • The end tarp cover is sandwiched between the hoop and the bottom of the wirelock channel.
  • When you pull the tarp over the peak, you will reinstall the wirelock channel from the top and work down.
  • If you do the left, right or bottom first will be determined by where the wrinkles are (if any).

Please don’t hesitate to call if you have any questions at all and please watch the videos on our YouTube channel for more information

Anchoring: Base Brackets vs Anchor Posts

edit-Base Bracketanchor post photo

We offer two main types of anchoring for our structures: Base Brackets (left pic) and Anchor Posts (right pic).

Which one you decide to go with largely depends on your application and location. They are not to be used together, it is a one or the other option. No matter which option you choose, please be aware, there is no such thing as too many anchors!

Although the building can be anchored directly into the ground with Anchor Posts, it can also sit on a slab, curb or beam or it can be elevated on some sort of a wall. Base brackets with lag bolts are supplied standard to fasten the building to the chosen form of foundation. Anchor Posts are available at an additional cost.

Anchor Posts must be set into concrete when:

  • the soil has been recently excavated (within the last 5 years)
  • it is required by the building code (use of concrete usually classifies the building as permanent)
  • extremely windy and exposed areas exist (at least use on the corner posts)
  • more than 10% of the anchor post will be out of the ground (upgrading anchor post size may be needed)
  • there are areas where erosion has been a problem in the past

Anchor Posts SHOULD NOT be used (and base brackets used instead) when:

  • the soil is a very heavy clay (heaving would be a constant problem)
  • there is a shallow rock layer
  • there are major amounts of rocks interfering with the accuracy of anchor post setting
  • the structure will be moved shortly (anchor posts must be cleaned out before reusing)

**Recommendations are based on years of experience. Ultimately the customer is responsible to properly anchor a structure**
Please see our installation pages for a more detailed breakdown of this topic Base Brackets vs Anchor Posts

Covering Ends – Plastic & Tarp

Please refer to the Ends page in the assembly guide as well

When you are covering the ends of the structure, there are some similarities and some fundamental differences when you are covering with plastic or with tarp.

The aluminum wirelock channel must be installed on the top side of the hoop before you start the cover. The framing must also be in place before you are putting on the cover.

Your cover will be a rectangle and you must double check if the two ends were supplied as one piece or not.

  • You start at the base of one side and go continuously over the peak so that there is not an edge at the peak.
  • The cover gets fastened, temporarily, at the base first on either side of the door and then pull out to the corners.

If there is ANY wind, do into the wind side first.

  • Please remember that whenever you have wrinkles or folds, you will pull 90 degrees to the wrinkle.

Excess on the end covers will only get trimmed off after the roof cover is on as well.

If you are covering the end with plastic

  • you would go with the extra of your rectangle and fasten it temporarily to the back side of your framing.
  • At the very most, at this stage you will put part of a wire insert on either side of the peak.
  • When the cover is sitting smooth, you can put some strapping on the vertical framing to hole the cover in place.

If you are covering the ends with tarp

  • you will need to remove the wirelock channel first.

This may seem like double work, but the channel is now curved to the building with the required screw holes.

  • The end tarp cover is sandwiched between the hoop and the bottom of the wirelock channel.
  • When you pull the tarp over the peak, you will reinstall the wirelock channel from the top and work down.
  • If you do the left, right or bottom first will be determined by where the wrinkles are (if any).

Please don’t hesitate to call if you have any questions at all and please watch the videos on our YouTube channel for more information

Covering Ends – Plastic & Tarp

Please refer to the Ends page in the assembly guide as well

When you are covering the ends of the structure, there are some similarities and some fundamental differences when you are covering with plastic or with tarp.
The aluminum wirelock channel must be installed on the top side of the hoop before you start the cover. You start at the base of one side and go continuously over the peak so that there is not an edge at the peak. Your cover will be a rectangle and you must double check if the two ends were supplied as one piece or not. The framing must also be in place before you are putting on the cover.

The cover gets fastened, temporarily, at the base first on either side of the door and then pull out to the corners. If there is ANY wind, do into the wind side first. Please remember that whenever you have wrinkles or folds, you will pull 90 degrees to the wrinkle. Excess on the end covers will only get trimmed off after the roof cover is on as well.

If you are covering the end with plastic, you would go with the extra of your rectangle and fasten it temporarily to the back side of your framing. At the very most, at this stage you will put part of a wire insert on either side of the peak. When the cover is sitting smooth, you can put some strapping on the vertical framing to hole the cover in place.

If you are covering the ends with tarp, you will need to remove the wirelock channel first. This may seem like double work, but the channel is now curved to the building with the required screw holes. The end tarp cover is sandwiched between the hoop and the bottom of the wirelock channel. When you pull the tarp over the peak, you will reinstall the wirelock channel from the top and work down. If you do the left, right or bottom first will be determined by where the wrinkles are (if any).

Getting Started….

We’ve added a new feature to our website that we hope will help some confusion when people ask, “but where do I start?” This new page gives a breakdown of steps to plan your structure, and helpful information links to short cut the website. We hope you find it helpful and we look forward to hearing from you!

Getting Started-Click Here!

We also have a steps for installing, that should be used in conjunction with our installation guide. If you haven’t seen it, be sure to click the links above to check it out!