Installation Overview

You will get a complete manual with every order, recently updated. You can download our instruction manual through the links below for a preview or to prepare for your delivery.

You can also view the additional articles, links or videos on our how to page. Please note, not all pages or options apply to everyone.

There is quite a bit of information contained in this manual that it CRITICAL to be understood. These structures are more complex to assemble than your typical Swedish Furniture.

The pages are in the order they should be read.
#1-2 are very important notes about installation and the rest of the manual.
#3 & #7 are options, you have one or the other
#6, 8, and 10 your building may or may not have depending on options you choose
1. START HERE
2. Requirements Before You Build
3. Anchoring – Base Brackets
3. Anchoring – Anchor Posts
4. ridge & hoops
5. Purlins & Windbraces
6. (optional) Cross Ties
7. Covering-Plastic Roof
7. Covering-Tarp Roof
8. (optional) Roll up Side Walls
9. Wirelock & Side Wall Cover Fasteners
10. (optional) Inflator Fan
11. End Wall Covering, Framing and End Ideas
12. Door ideas and options

click here to download a step by step breakdown of the process in PDF format. TO BE USED IN CONJUNCTION WITH THE MANUAL ABOVE, NOT AS A STAND ALONE RESOURCE.

general inside

You can download our Hanley Assembly installation overview

You can download our movable structure information package 

You can download information for installing our Accordian door or Roll up door assembly

One of the most common questions we get asked is regarding installation of our structures. We have tried to create a simple yet effective solution for your applications, and recently have revamped our installation guide with more pictures, a glossary and more detailed instructions about everything to empower our customer more. You can find that above. (SEE ABOVE 1-14)

 We are in the process of creating more videos, and you can see our current how tos here. These structures are supplied as kits, intended for our customer to be able to install themselves. We are available for whatever questions you may have.
Many of our customers are also familiar with a contractor or someone in their area they trust to install their structure, and we are happy to work with them to create an understanding so the customers are not required to be educators as well.
Although we used to install, the weather has become far too unpredictable and we simply do not have the man power to be able to get the structures out in a timely manner as well as install. Anyone who would be worth recommending is booking at least 3 months out.
We have confidence that you will be able to install these structures yourselves with a small team of people and are currently working on a small database of customers in various areas that are willing to coach or give advice for a small fee to new customers who are looking for guidance.
Thank you for your inquiry, but no, we do not install, or know anyone yet that could help.
ORIENTATION & LOCATION

It is generally accepted that a north/south facing building picks up the sunlight better and an east/west building ventilates easier. Therefore, unless you are into cut flowers or a similar high production item east/west is preferred. “Preferred” is the operative word. There are a number of other things that come into play and warrant consideration…. READ MORE

INSTALLATION BY MULTI SHELTERS

Multi Shelter Solutions does not have a crew that goes around to various sites. The area we supply buildings to is simply too large to cover with an installation crew…. READ MORE

DRAWINGS AND PERMITS

To have a full set of drawings for each structure variation would be impossible. We are slowly working through the more popular models and having an engineer review them for conformity to the building code. If your building inspector requires a specific set of drawings for your application, there will be a small fee charged…. READ MORE

WEATHER CAUTIONS

These buildings are not industrial grade shelters and, as such, some caution must be exercised under some winter storm conditions…. READ MORE

Covering Ends – Plastic & Tarp

Please refer to the Ends page in the assembly guide as well

When you are covering the ends of the structure, there are some similarities and some fundamental differences when you are covering with plastic or with tarp.

The aluminum wirelock channel must be installed on the top side of the hoop before you start the cover. The framing must also be in place before you are putting on the cover.

Your cover will be a rectangle and you must double check if the two ends were supplied as one piece or not.

  • You start at the base of one side and go continuously over the peak so that there is not an edge at the peak.
  • The cover gets fastened, temporarily, at the base first on either side of the door and then pull out to the corners.

If there is ANY wind, do into the wind side first.

  • Please remember that whenever you have wrinkles or folds, you will pull 90 degrees to the wrinkle.

Excess on the end covers will only get trimmed off after the roof cover is on as well.

If you are covering the end with plastic

  • you would go with the extra of your rectangle and fasten it temporarily to the back side of your framing.
  • At the very most, at this stage you will put part of a wire insert on either side of the peak.
  • When the cover is sitting smooth, you can put some strapping on the vertical framing to hole the cover in place.

If you are covering the ends with tarp

  • you will need to remove the wirelock channel first.

This may seem like double work, but the channel is now curved to the building with the required screw holes.

  • The end tarp cover is sandwiched between the hoop and the bottom of the wirelock channel.
  • When you pull the tarp over the peak, you will reinstall the wirelock channel from the top and work down.
  • If you do the left, right or bottom first will be determined by where the wrinkles are (if any).

Please don’t hesitate to call if you have any questions at all and please watch the videos on our YouTube channel for more information