Winter Care & Maintenance

These buildings are not industrial grade shelters and, as such, some caution must be exercised under some winter storm conditions….

Please see the WINTER CARE page in our installation guide for additional information. We also have a Winter Care FAQ page with articles we have posted on this topic

Our structures are designed in a gothic shape with a slippery cover to be lightweight and snow resistant. This encourages the snow to slide off quickly.
This is not an industrial high snow load building.

We do our best to always point out applications where the capacity of the structure is being compromised.

Extra hoops or thicker steel are an economical way to increase wind and snow load capacity.

We take pride in the sturdy shelters we manufacture and supply, but must point out that we cannot warranty against weather conditions.

Snow removal, when occasionally required, is a simple task.

Uneven snow loading is deceiving since the total weight is not a problem but the lateral force can cause the hoops to distort.

It is rare to have any significant snow build up on the roofs; however,

DO NOT GO INSIDE A BUILDING WHERE THERE HAS BEEN OBVIOUS STRESS!
Be aware of these scenarios where excessive snow build-up is possible and damage could follow:

A wet snowfall followed by dropping temperatures

A building 90° to the prevailing wind (drifts could form on the backside of the building)
A building attached to and situated downwind of a taller building (significant drifting)
A building 90° to another building that has a higher roof, could cause a surge in snow weight when the snow on the upper roof slides off.

Preventative measures for excessive snow build up (where possible):

Build structures in line with the prevailing wind
Build structures level from side to side to create uniform shedding
Do not attach your building to a larger existing building
Install a heat source to melt the snow

Economical additions to increase your structure’s snow resistance:

Install cable or tubular cross-ties at each pair of hoops, to create a triangle (when using cables there is no need to put them under tension)
Place wooden or metal support posts under the ridge.

These can be suspended from the ridge with no more than ½” ground clearance.

This will provide support as soon as there is load and structure movement will not dislodge your supports.

Use closer hoop spacing for the first 12’ section away from another bigger building

Pointers for removing snow:

NEVER remove all the snow from one side and then the other
Remove the snow off the top of your building before using a machine (snowblower, etc) along the sides
Use a padded piece of 1×4 wood on a pole (create a “T” shape) as the best tool for gently bumping the inside of the cover
BEWARE of this sequence which creates a “worst-case scenario”:
Freezing rain, followed by dropping temperatures, Lots of snow followed by rainfall. It is easy to triple the weight of the snow load in 30 minutes.
Please call us if you have any questions about any of this. Thank you