Tag Archives: plastic cover

Installing Multiple Covers into One Wirelock Channel

This post covers another one of our most frequently asked questions,

HOW TO INSTALL MULTIPLE COVERS INTO ONE WIRELOCK CHANNEL!

We hope the description and video can help clarify this issue a bit more. Thanks for your feedback!

The beauty of wirelock is its ability to hold multiple layers of covers, even covers in different directions (i.e. roof and ends or 2 long lengths).

Before starting you must at least have the cover tacked at the opposite end. This will give you resistance for pulling the cover tight.

Our wirelock channel will hold up to 3 layers of 6 mil plastic securely.

Two layers of 12 mil tarp will not be held securely in the wirelock channel. This is why we recommend that the top of the end wall tarp be sandwiched between the channel and the hoop.

If you have never installed these covers before, it is recommended to use at least 3 people.

  • After the bottom of the end cover has been secured, pull the end cover over the hoop first.
  • Person “A” will hold it from the inside of the structure in such a way that there are no wrinkles.
  • The roof cover can now go over the channel as well.
  • Person “B” will pull on the roof cover while person “C” installs the stainless spring steel wire inserts.
  • “C” will start from the peak and work down.

It is critical to remember that “A” and “B”, who are pulling on the two respective covers, must always be pulling at least a foot ahead of “C” who is installing the wire insert. This will allow a little give in the covers so that there will not be damage.

With more experience “B” and “C” can be done by one person.

It is also important to remember the wrist technique for installing the wire insert. Do not slide the wire straight back and forth. This causes abrasions on the cover.

As you move back and forth, apply pressure with the thumb on the next parallel spot of the wire insert.
Use a needle nose pliers to get the last tip into the channel.
The next wire insert does not have to be overlapped.

For more details and to watch an illustration, please see our YouTube Video below

Retightening a Loose Structure Cover

Previously we outlined how to do a temporary fix for loose cover. This should not be left for an extended period. Re-tightening a cover does not have to be done in one day.

  • The job MUST split into two parts lengthwise.
  • The cover must be pulled lengthwise BEFORE it is pulled from side to side.
  • Make sure you do the tightening process on a calm, warm day.
  • You should do the end which looks the worst first.
  • This job will require taking ALL of the cover fasteners out.

Taking a short cut will leave you with more wrinkles.
Areas with wrinkles will flutter more and cause stress points.
This will also cause the cover to deteriorate quicker.

When you are tightening the cover, you should always pull 90 degrees to the wrinkle.

This means that after you have secured at the peak,
most often you will be pulling diagonally to the corner.

Once you have done one end/half and the wind is still down, you can start loosing the fasteners on the other end and repeat the process until complete.

Please don’t hesitate to contact us if you have any questions.

You can also see additional information in our installation guide:
Tarp Covering Instructions
Plastic Covering Instructions
Wirelock & Side Wall Cover Fasteners
covering options

Installing Multiple Covers into One Wirelock Channel

This post covers another one of our most frequently asked questions, and we hope the description and video can help clarify this issue a bit more. Thanks for your feedback!

The beauty of wirelock is its ability to hold multiple layers of covers, even covers in different directions (i.e. roof and ends or 2 long lengths). Before starting you must at least have the cover tacked at the opposite end. This will give you resistance for pulling the cover tight. Our wirelock channel will hold up to 3 layers of 6 mil plastic securely. Two layers of 12 mil tarp will not be held securely in the wirelock channel. This is why we recommend that the top of the end wall tarp be sandwiched between the channel and the hoop.

If you have never installed these covers before, it is recommended to use at least 3 people. After the bottom of the end cover has been secured, pull the end cover over the hoop first. Person “A” will hold it from the inside of the structure in such a way that there are no wrinkles. The roof cover can now go over the channel as well.  Person “B” will pull on the roof cover while person “C” installs the stainless spring steel wire inserts. “C” will start from the peak and work down. It is critical to remember that “A” and “B”, who are pulling on the two respective covers, must always be pulling at least a foot ahead of “C” who is installing the wire insert. This will allow a little give in the covers so that there will not be damage. With more experience “B” and “C” can be done by one person.

It is also important to remember the wrist technique for installing the wire insert. Do not slide the wire straight back and forth. This causes abrasions on the cover. As you move back and forth, apply pressure with the thumb on the next parallel spot of the wire insert. Use a needle nose pliers to get the last tip into the channel. The next wire insert does not have to be overlapped.

For more details and to watch an illustration, please see our YouTube Video below

Retightening a Loose Structure Cover

Previously we outlined how to do a temporary fix for loose cover. This should not be left for an extended period. Re-tightening a cover does not have to be done in one day.

  • The job MUST split into two parts lengthwise.
  • The cover must be pulled lengthwise BEFORE it is pulled from side to side.
  • Make sure you do the tightening process on a calm, warm day.
  • You should do the end which looks the worst first.
  • This job will require taking ALL of the cover fasteners out.

Taking a short cut will leave you with more wrinkles.
Areas with wrinkles will flutter more and cause stress points.
This will also cause the cover to deteriorate quicker.

When you are tightening the cover, you should always pull 90 degrees to the wrinkle. This means that after you have secured at the peak, most often you will be pulling diagonally to the corner.

Once you have done one end/half and the wind is still down, you can start loosing the fasteners on the other end and repeat the process until complete.

Please don’t hesitate to contact us if you have any questions.

You can also see additional information in our installation guide:
Tarp Covering Instructions
Plastic Covering Instructions
Wirelock & Side Wall Cover Fasteners
covering options

Up to Date Pricing & Brochures

Please note: As of today, we have updated pricing on all the application pages to be current with the market trends.

Please use these prices as a guide only and call for your custom quote for up to date pricing. The market pricing is unstable at the moment and we may need to make some adjustments.

If you have previously downloaded our brochures, please have another look for more accurate information and pricing. There are new brochures as well as price blocks. We look forward to helping you with your next shelter solution!